Plan Status: #141 was successful

Build: #141 was successful

History

Previous
  1. #101 (Not built)
  2. #137 (Successful)
  3. #138 (Failed)
  4. #139 (Successful)
  5. #140 (Successful)
  6. #141 (Successful)

Plan Navigator

Build #141

Build Result Summary

Details

Trigger
Code has been updated by Gaston Ponti.
Revision
0f41212c89a888f81a91f4d4ab06abf836952a46
Completed
Duration
8 minutes
Successful since
#139 ()
Labels
None 
8 tests in total

Test Summary

  • 0 New Failures
  • 0 Existing Failures
  • 0 Fixed

Code Changes

  •     Gaston Ponti

    Gaston Ponti

    [maven-release-plugin] prepare for next development iteration
     

Powered by a free Atlassian Bamboo open source license for MuleForge. Try Bamboo - The Zen of Continuous Integration.