Plan Status: #12 was successful

Build: #12 was successful

History

Previous
  1. #9 (Failed)
  2. #10 (Successful)
  3. #11 (Successful)
  4. #12 (Successful)

Plan Navigator

Build #12

Build Result Summary

Details

Trigger
Code has been updated by Gaston Ponti.
Revision
ab18fda253f36c38e99a1b2d8c29c57fd21e13fe
Completed
Duration
1 minute
Successful since
#10 ()
Labels
None 
6 tests in total

Test Summary

  • 0 New Failures
  • 0 Existing Failures
  • 0 Fixed

Code Changes

  •     Gaston Ponti

    Gaston Ponti

    [maven-release-plugin] prepare for next development iteration
     

Powered by a free Atlassian Bamboo open source license for MuleForge. Try Bamboo - The Zen of Continuous Integration.